一区二区三区无码毛片|伊人亚洲大杳蕉色无码|欧美日韩久久久成人大片|理论片免费ā片在线观看|日韩国产亚洲欧美一区二区|成年免费A级大毛片免费看|亚洲熟女乱综合一区二区三区|国产成a人片在线观看视频99

Flame retardants division:

+86-13812233176(Manager Jiang)

+86-18156150062(Manager Sheng)

Blowing agent division:

+86-18156150062(Manager Sheng)


Surface activity division:

+86-18936052698(Manager Xu)

+86-17706153456(Manager Zhou)

Hot line:

+86-0561-7888202

+86-0510-87655898

ENGLISH

News

Your Current Location:Home - News - Enterprise news

News

News

Here you are concerned about the company dynamics and industry information

Anhui Runyue Technology Co., Ltd. year facility completion date and commissioning time publicity

Release time:2023-03-03 11:37:20      Number of clicks:651

According to the requirements of the announcement on the Interim Measures for the Acceptance of Environmental Protection on the Completion of Construction Projects (National Environmental Regulatory Assessment [2017] No. 4), the completion date and commissioning time of environmental protection facilities supporting the construction of the project are now publicized.

I. Project overview

Project name: Annual output of 21,000 tons phosphorus series flame retardant project

The completion and commissioning of the environmental protection facilities supporting the construction of the 21,000 tons of phosphorus series flame retardant project is publicized as the first stage, and the specific products and production capacity of the first stage are as follows:

1 set of H blowing agent production equipment, 1 set of BK auxiliary workshop production equipment, 1 set of triethyl phosphate (TEP) production equipment, 3 sets of triethyl phosphate (2-chloropropyl) ester (TCPP) production equipment, 1 set of triethyl phosphate (2-chloroethyl) ester (TCEP) production equipment (cancelled construction) and supporting environmental protection facilities, Forming an annual production capacity of 5,000 tons of H foaming agent, 5,000 tons of urea additives, 10,000 tons of triethyl phosphate (TEP), 40,000 tons of tri (2-chloropropyl) phosphate ester (TCPP).

Construction unit: Anhui Runyue Technology Co., LTD

Construction location: Anhui (Huaibei) new coal chemical synthetic materials base, south of the base North Road, east of Huaixing Road;

Project Introduction: This project is to be built in Anhui (Huaibei) new coal chemical synthetic materials base. This project will build 1 3F production workshop and 1 3F finished product warehouse, covering an area of 2642m2. At the same time, one 200m3 BDP storage tank, one 200m3 RDP storage tank, one 250m3 phenol storage tank, one 80m3 toluene storage tank, and one 80m3 cyclohexane storage tank are added, and one set of TPP production unit, one set of BDP production unit and one set of RDP production unit are built. Form an annual production capacity of 21,000 tons of phosphorus series flame retardant products (annual output of 2,000 tons TPP, 9,000 tons BDP, 10,000 tons RDP). The project wastewater treatment relies on the existing sewage treatment station in the plant, and the waste gas relies on the existing waste gas treatment system of "alkali absorption + acid absorption + water absorption + mist remoster +RTO+ cooling tower + three-stage alkali washing" in the plant. The temporary storage of hazardous waste relies on the existing temporary storage of hazardous waste in the plant area.

21,000 tons of phosphorus series flame retardant project total investment: 85 million yuan.

2. Contents of environmental protection facilities for supporting construction

(1) Wastewater recovery tank, wastewater treatment multi-effect evaporation concentration salt extraction, semi-buried integrated power treatment facilities (iron carbon micro-electrolysis +Fenton oxidation + neutral coagulation precipitation + comprehensive regulation tank + pulse anaerobic +MBBR aerobic + precipitation)

(2) waste gas treatment system: Acidic waste gas is mainly hydrogen chloride and waste gas generated by BDP device, and acidic waste gas is concentrated into the tail gas absorption tower through the pipeline; The breathing gas of the tank farm is connected to the tail gas main through the breathing pipe and introduced into the tail gas absorption tower. The hydrogen chloride is pretreated by water absorption and alkali absorption process. The hydrogen chloride after absorption and treatment in the BDP workshop enters the "alkali absorption + water absorption + adsorption desorption +RTO device" for treatment, and the tail gas after treatment in the tertiary alkali absorption tower is discharged through the 25m high exhaust cylinder (1# exhaust cylinder). HCl waste gas from the tank farm is absorbed by the three-stage falling film and discharged through a 15m high exhaust cylinder (5# exhaust cylinder).

(3) emergency pool, initial rainwater recovery system, toxic and combustible gas detection and alarm measures;

(4) sound insulation and shock absorption equipment and materials;

(5) Hazardous waste temporary storage, waste salt, sludge drying device, garbage collection box;

(6) Plant zone seepage prevention;

(7) Plant greening;

(8) The investment of environmental protection facilities for supporting construction is 13 million yuan, accounting for 15.3% of the total investment of the project.

3. Publicity time

Completion date of environmental protection facilities: January 10, 2023

Environmental protection facilities commissioning start and end time: March 15, 2023 - June 15, 2023

Four, the main way of publicity

Through Anhui (Huaibei) new coal chemical synthetic materials base official website and on-site publicity methods to the public. Contact details are as follows:

(1) Name and contact information of the project construction unit

Construction unit: Anhui Runyue Technology Co., LTD

Contact: Shi Shanwen

Contact number: 15295229528

(2) Undertake the construction of supporting environmental protection facilities units and contact information


Item

Civil engineering

Equipment engineering

Construction unit

Huaibei Huimin Engineering construction Co., LTD

Suhua Construction Group Co. LTD

Unit address

No. 1619, Hairong Commercial Building, 138 Nanli Road, Xiangshan District, Huaibei City, Anhui Province

Hongkou Road, Liyang City, Jiangsu Province No. 333

Contact person

Liu Xuefeng

Meng Jianjun

Contact number

+86-18956118110

+86-13585430568


Anhui Runyue technology Co., LTD

December 10, 2002

Previous:NO!
Next:Anhui Runyue Technology Co., Ltd. hazardous waste pollution prevention information disclosure

Return list

News you are interested in
COPYRIGHT ? 2023 ALL RIGHTS RESERVEDAnhui Runyue Technology Co., LTD